Capstone Green Energy and Microgrids 4 AI Announce 800 VDC On-Site Power to Chip Next-Generation AI Infrastructure
unknown📝 Article Content
LOS ANGELES & REDWOOD CITY, Calif., October 21, 2025--Capstone Green Energy Holdings, Inc., and its subsidiaries (the "Company" or "Capstone") (OTCQX: CGEH) a leading provider of clean, low-emission microturbine energy systems and clean technology solutions, and Microgrids 4 AI, Inc. ("MG4AI"), a developer of modular, AI-ready data center infrastructure, today announced their 800-volt direct-current (VDC) microturbine plus compute engineered equipment package to power the next generation of AI i
📄 Summary
LOS ANGELES & REDWOOD CITY, Calif., October 21, 2025--Capstone Green Energy Holdings, Inc., and its subsidiaries (the "Company" or "Capstone") (OTCQX: CGEH) a leading provider of clean, low-emission microturbine energy systems and clean technology solutions, and Microgrids 4 AI, Inc. ("MG4AI"), a developer of modular, AI-ready data center infrastructure, today announced their 800-volt direct-current (VDC) microturbine plus compute engineered equipment package to power the next generation of AI i