Capstone Green Energy and Microgrids 4 AI Announce 800 VDC On-Site Power to Chip Next-Generation AI Infrastructure

unknown
📅 Published: 2025-10-21 13:00 📰 Source: Yahoo 📝 Words: 69

📝 Article Content

LOS ANGELES & REDWOOD CITY, Calif., October 21, 2025--Capstone Green Energy Holdings, Inc., and its subsidiaries (the "Company" or "Capstone") (OTCQX: CGEH) a leading provider of clean, low-emission microturbine energy systems and clean technology solutions, and Microgrids 4 AI, Inc. ("MG4AI"), a developer of modular, AI-ready data center infrastructure, today announced their 800-volt direct-current (VDC) microturbine plus compute engineered equipment package to power the next generation of AI i

📄 Summary

LOS ANGELES & REDWOOD CITY, Calif., October 21, 2025--Capstone Green Energy Holdings, Inc., and its subsidiaries (the "Company" or "Capstone") (OTCQX: CGEH) a leading provider of clean, low-emission microturbine energy systems and clean technology solutions, and Microgrids 4 AI, Inc. ("MG4AI"), a developer of modular, AI-ready data center infrastructure, today announced their 800-volt direct-current (VDC) microturbine plus compute engineered equipment package to power the next generation of AI i

Scraping Metadata:

Scraped At: Unknown
Created At: 2025-10-22 01:07:30
Updated At: 2025-10-22 01:07:30
Scraping Job ID: N/A

Stock Mentions:

LOW - Lowe's Companies Inc. Relevance: N/A